Casting "L" road kerb.

Ok, before we cast the road kerb, we must first make sure :
  1. the crusher-run is below 120mm for the FRL (finish road level).
  2. the crusher-run is fully compacted.
  3. make sure you put sunblock before you start work...(just kidding)
once the crusher-run is flat, compacted and leveled to the proper level, we can order the material, quarry dust and slurry.

we first mix the quarry dust and slurry. then we place the road kerb machine to where we want to cast the road kerb. after that pour the quarry dust mixture onto the kerb machine and let the machine do the work. Mr.Agung here will be controlling the road kerb machine.

Time to polish the road kerb.


this is another way to make road kerb, which is by hand and far more slower. only use for small length road kerb.